Among waterproofing companies in Sharjah, Dubai Technical Works covers concrete roofs, industrial metal roofs, basements, bathrooms, water tanks, pools and balconies across villas, towers and warehouses. Systems start at AED 45 per sqm, a surveyor reaches active leaks within 24 to 48 hours, every membrane is flood-tested before reinstatement, and warranties run up to 10 years.
Call +971 55 711 3252 for a free leak survey.

We work on private villas, apartment towers, labour accommodation, warehouses, factories, showrooms, schools, universities, and government buildings.
Two kinds of jobs come through. New construction waterproofing is applied to a fresh slab before screed and finishes. And remediation, where a building is already leaking, and someone needs it stopped before tenants start complaining or stock gets damaged.
Our clients include villa owners, apartment residents, landlords, property managers, developers, main contractors, facility management companies and warehouse operators.
Coverage runs across Sharjah city and its residential districts, the industrial areas and Al Sajaa, University City and Muwaileh, out to Khor Fakkan and Kalba, plus Ajman, Umm Al Quwain, Ras Al Khaimah and Dubai through our main waterproofing division.
Sharjah’s industrial stock is overwhelmingly metal sheet roofing, and those roofs leak at the fasteners. Washers perish under UV, the screw backs out slightly with thermal movement, and water runs down the thread into the building. We reseal screw lines, replace failed fasteners, and coat the sheet. Typical cost: AED 18,000 to 60,000 depending on roof area.
One bathroom membrane fails, and three flats below get stained ceilings. The source is almost always a drain detail or a pipe penetration, not the field membrane. We isolate the unit, strip, rebuild the detail, and flood-test before anyone retiles. Typical cost: AED 2,500 to 7,000 per bathroom.
Insulation under a metal roof absorbs water from an unnoticed leak, compacts, and stops insulating. Cooling costs climb, and the sheet corrodes from the inside. By the time ceiling drips appear, the insulation is already saturated. We core sample before quoting, because a coating over wet insulation solves nothing.
Tiles laid straight over an old membrane with no movement provision crack along the same lines every time. Water then sits between the layers. The fix is strip-out, substrate repair, new membrane, and fresh falls. Typical cost: AED 14,000 to 32,000 on a standard villa terrace.
Schools and university buildings around University City carry large flat roofs with long drainage runs. When falls are wrong or outlets are blocked, water stands for days and works into every weak lap. Correcting falls costs more than the membrane but is the only fix that lasts.
Sharjah’s 1980s and 1990s buildings in Al Qasimia, Abu Shagara and Al Nasserya show cracked render, blown plaster and damp patches. Water enters through facade cracks and window perimeters, not through the wall face. We seal the entry points and treat the wall rather than repainting over it.
Flat concrete roofs, terraces, parapets and rainwater outlets. Most failures we open up are at the parapet upstand or the drain collar, not the field membrane. See roof waterproofing.
Sheet roofs, gutters, ridge and valley details, skylight perimeters and screw lines across the industrial areas and free zones. Different materials, different failure points and different access requirements from a concrete roof.
Basement walls, foundation slabs, retaining walls and underground parking. Below-ground work faces hydrostatic pressure, so systems designed only for positive-side protection get pushed off. Details on basement waterproofing.
Floors, shower zones, walls, drains and pipe penetrations. Grout is porous by design. The membrane under the tile is the actual barrier. More on bathroom waterproofing.
Concrete tanks, base slabs, penetrations and overflow channels lined in GRP. Potable water tanks need compliant food-grade linings, confirmed before quoting rather than after.
Balcony slabs, balustrade fixings, planters and decks over occupied space. Planters need a root barrier above the membrane, or roots find the smallest lap within a few seasons.
Wall cracks, render repair, facade joints and window perimeters. Wind-driven rain during the winter storm months pushes water through cracks that look harmless in dry weather.
Warehouse floors, plant rooms and workshops across the industrial belt. Systems that handle forklift traffic, chemical spills, and washdown. See epoxy floor coating.
Movement joints, construction joints and structural cracks sealed with PU or epoxy injection. PU expands on contact with water, which makes it right for a crack actively passing water.
Thermal cameras show where moisture sits inside a build-up, and moisture meters confirm it. On a large warehouse roof, this narrows a search from 2,000sqm to a 20sqm zone in an afternoon.
We pond water on a suspect area and watch below. On bathrooms and balconies, this isolates the failure within 24 hours. Dye tracing works where water enters at a specific drain or penetration.
Water tracks laterally through screed and across slabs before it drops. A stain in a third-floor ceiling can come from a terrace detail twenty metres away.
Around one in four leaks we survey turns out to be plumbing or AC condensate rather than waterproofing. Our leak detection team rules that out before anyone quotes a membrane.
Ambient air reaches the mid-40s in summer, but a dark exposed membrane runs far hotter. That heat softens cheap bitumen and breaks down coatings never rated for sustained UV.
Properties around Khalid Lagoon, Al Khan and Al Majaz sit in salt-laden, humid air. Salt driven into render and concrete attacks reinforcement through any breach in the coating, and buildings on the water see efflorescence years before inland stock.
Industrial areas and Al Sajaa carry heavy airborne dust and process fumes. Dust beds into uncured coatings and ruins adhesion, which is why we schedule application around site activity instead of working through it.
Flat areas rarely fail. Parapet upstands, rainwater outlets, pipe collars and movement joints fail constantly. A perfectly applied field membrane with a badly terminated upstand still leaks.
Reinforced modified bitumen applied in laps. The workhorse for concrete roofs under screed or tile. 15 to 20 years when detailed and protected properly. See membrane waterproofing.
Seamless and flexible, bridging hairline cracks that would split a rigid coating. Right for roofs with complex geometry and many penetrations. 10 to 15 years exposed.
Spray-applied, cures in seconds, extremely tough. Earns its place on large commercial roofs and tanks where downtime costs money. See polyurea coating.
Cement slurry bonding directly to concrete. Cost-effective for bathrooms, wet areas, and tanks under tile. Rigid, so it needs a stable substrate.
Reactive chemicals grow crystals inside the concrete capillaries, sealing from within. Works against negative-side pressure, which matters for basements. See crystalline waterproofing.
Glass-reinforced polyester is laminated in place, forming a jointless basin independent of the structure. Strongest option for tanks and sunken slabs that already leaked.
Fastener replacement, screw-line sealing, lap treatment, and an elastomeric coating over the sheet. Extends a corroding industrial roof by 10 to 15 years at a fraction of resheeting cost.
Membrane plus thermal insulation in one build-up, cutting roof surface temperature and the cooling load underneath.
Pressure-injected resin into cracks and joints. PU for active water, epoxy for structural bonding on dry cracks. We apply Sika, Mapei, Fosroc, Drizoro, and BASF MasterSeal systems, and the product name goes on your quote.
Overlay saves 30% to 40% against a full strip-out, and it works when the existing membrane is bonded, the substrate below is dry, and the roof is structurally sound.
It fails when moisture is trapped in the insulation or screed. Sealing a wet build-up under a new layer traps the water, and the first hot season drives it into blisters that lift the new membrane off. This is exactly why so many villa terraces crack again within two years of being “fixed”.
We take core samples and measure moisture content before recommending an overlay. Reading a roof from the surface is guessing.
Isolated detail failure on a sound membrane is a repair job. Expect AED 1,500 to 7,000 for a drain collar, an upstand or a localised tear.
Two or more failure points, or a membrane past twelve years, means replacement. Patching an aged system buys one season and costs you the screed and tile reinstatement twice.
The survey is free and takes 2 to 4 hours. We inspect, thermal-scan where useful, core samples where needed, identify the source, and issue a written report naming the cause, the recommended system, and a fixed price.
|
System |
Price (AED/sqm) |
|
Cementitious coating |
45 – 85 |
|
Liquid applied PU membrane |
65 – 135 |
|
Torch-on bituminous membrane |
55 – 115 |
|
Polyurea spray coating |
150 – 310 |
|
GRP lining |
170 – 330 |
|
Epoxy floor coating |
85 – 210 |
|
Crystalline waterproofing |
50 – 105 |
|
Metal roof coating and screw-line sealing |
60 – 140 |
|
Combo insulated roof system |
120 – 250 |
|
Crack injection (per metre) |
200 – 520 |
|
Project |
Price (AED) |
|
Apartment bathroom |
2,500 – 7,000 |
|
Balcony |
3,000 – 8,500 |
|
Villa roof, 200sqm |
16,000 – 35,000 |
|
Concrete water tank |
8,500 – 24,000 |
|
Basement |
Quoted after survey |
|
Warehouse metal roof, 1,000sqm |
60,000 – 140,000 |
The membrane is roughly half a bathroom or balcony job. Tile removal and disposal runs AED 55 to 110 per sqm, screed repair AED 65 to 140, and tile supply and laying AED 90 to 400 depending on the tile. Our quotes include reinstatement, handled by our own tiling team, plus ceiling repainting where a leak has stained the unit below.
Access and working height, whether the existing layer comes off, substrate repair, insulation, reinstatement, and phasing around occupied or operating space.

Inspection, moisture mapping, source identification, written report, and fixed price. 2 to 4 hours.

Cores taken on existing roofs to confirm what sits underneath and whether it is dry. This decides overlay versus strip-out.

Failed layers removed, surface cleaned back to sound substrate, laitance and contaminants taken off. One to three days.

Cracks cut and filled, spalled concrete repaired, falls corrected to the drains. Water that ponds instead of draining shortens any membrane’s life. One to three days.

Primer applied, then reinforcement at every upstand, outlet, pipe collar, and movement joint before the field membrane goes down

System applied at specified coverage and thickness, then cured to manufacturer requirements. Two to five days.

Hold test, protection board or screed, then handover with photos and warranty documents. Three to five days.
| Area | Preparation | Application | Cure & Test | Reinstatement | Total |
|---|---|---|---|---|---|
| Bathroom | 1 day | 1 day | 3 days | 2–3 days | 6–8 days |
| Balcony | 1 day | 1 day | 3 days | 2 days | 6–7 days |
| Villa roof (200sqm) | 2–3 days | 3–4 days | 4 days | 3–4 days | 12–15 days |
| Water tank | 2 days | 2–3 days | 4 days | 2 days | 10–12 days |
| Basement | 3–5 days | 4–6 days | 4 days | 4–6 days | 15–21 days |
| Warehouse roof (1,000sqm) | 5–7 days | 7–10 days | 5 days | 3–5 days | 20–27 days |
We pond water across the membrane, mark the level, and hold it for 48 to 72 hours. Photographed at both ends, with the space below checked for moisture before sign-off.
A contractor who screeds or tiles the day after the final coat has tested nothing. You find out whether the system worked once the finishes are down, which is the most expensive possible moment to discover a failure.
Waterproofing of roofs, wet areas and below-ground structures forms part of the building works inspected under Sharjah Municipality requirements. On permitted works, it must be completed and signed off before finishes go back on.
Towers and managed buildings want contractor documentation before work starts: trade licence, public liability insurance, worker Emirates ID details, and usually a refundable deposit. Add a booked service lift, a crane or hoist slot for roof material, an agreed debris route, and set working hours. Approvals run 5 to 10 working days, so we submit the day you accept the quote. Where water supply isolation is needed for tank work, we coordinate the shutdown with SEWA and the building.
SAIF Zone and Hamriyah Free Zone both run their own gate pass and contractor registration processes. We hold current registration rather than turning up and being refused entry, which costs a day on sites where a crane is already booked.
Report it to building management the day you find it, and document everything with photos and dates.
Liability follows the source. The owner of the unit where the leak originates generally carries the damage below, with building or owner insurance responding depending on the cover in place.
What settles these disputes quickly is a written contractor report naming the cause. Without one, you get two owners arguing and a building manager with no basis to decide. Our survey report is written to serve exactly that purpose.
Before you award the job, ask for these six things.
A quote that names no system is not a quote. It is a price for an unknown product applied to an unknown standard.
Large-span sheet roofs across Industrial Areas 1 to 18, Al Sajaa, SAIF Zone and Hamriyah. Screw-line sealing, lap treatment and elastomeric coating, plus epoxy floor systems inside.
Ablution blocks, kitchens and roofs where a failure disrupts hundreds of people at once. We phase block by block so no facility closes completely.
Occupied-building work around University City and Muwaileh with access control, noise limits and inspection requirements. Scheduled around term dates and exam periods.
Large roofs get sectioned so nothing is left open overnight, with temporary terminations at each day’s edge. A roof stripped faster than it can be closed is a flood risk, and the winter rain months are exactly when people rush that.
Active leaks into occupied space or over stored goods get a surveyor within 24 to 48 hours. The first visit is containment and source identification, not a permanent fix.
Permanent systems go on once the substrate is measurably dry. A membrane applied over wet concrete blisters and debonds, which means paying for the job twice. We say that even when the client wants it finished tomorrow.
October through April is the application window.
Summer roof surface temperatures push liquid systems past their limits, solvent flashes off before the film can level, and torch-on work in 45°C ambient is unsafe and inconsistent.
Planned re-waterproofing books from October and fills quickly, because every warehouse operator and building owner wants the roof closed before the winter rain. Emergency repairs run year-round with early-morning scheduling.

Warehouse, Industrial Area 12, 1,100sqm metal roof. Screw lines resealed, 400 fasteners replaced, elastomeric coating over sheet. AED 92,000, fourteen days phased around operations.

Apartment building, Al Nahda, five bathrooms. Ceiling stains across three floors traced to failed drain details. Cementitious system, flood-tested, retiled unit by unit. AED 21,500, twelve days.

Villa, Al Ramtha, 190sqm roof and terrace. Full strip-out after a tile overlay cracked twice. Torch-on membrane, new falls, terrace retiled. AED 29,800, fifteen days.
Al Nahda
Al Majaz
Al Khan
Al Qasimia
Al Taawun
Muwaileh
Al Nasserya
Abu Shagara
SAIF Zone
Al Ramtha
Industrial Areas
Al Sajaa
Al Saja’a Industrial Oasis
Hamriyah Free Zone
University City
Muwailih Commercial
Al Suyoh
Tilal City
Al Rahmaniya
Sharjah Waterfront
Umm Al Quwain
Valid trade licence, public liability cover and worker insurance, with documentation ready for municipality, building and free zone submissions. Our applicators are trained on the systems we install.
The quote states the system, manufacturer, coverage rate, and price, including reinstatement. If we strip a roof and find structural concrete damage nobody could see, we stop and quote that separately for approval.
Every membrane is hold tested before screed, tile or protection goes back on. You see the photos before you pay for the reinstatement stage.
Polyurea 10 years, torch-on membrane 10, crystalline 10, liquid PU 7, cementitious 5. The warranty covers membrane and workmanship failure. Structural movement, third-party damage, and later penetrations drilled through the system are excluded, and we write that on the quote rather than mention it afterwards.
A leaking bathroom needs waterproofing, plumbing and tiling. A stained ceiling needs repainting afterwards. We handle all of it.
FAQs
Cementitious systems run AED 45 to 85 per sqm, torch-on membrane AED 55 to 115, liquid PU AED 65 to 135, and metal roof coating AED 60 to 140. A bathroom costs AED 2,500 to 7,000 complete, and a 200sqm villa roof costs AED 16,000 to 35,000, including reinstatement.
A 200sqm villa roof runs AED 16,000 to 35,000 depending on the system and whether the existing layer comes off. Overlay on a sound, dry substrate saves 30% to 40% against a full strip-out. Core sampling at the survey confirms which applies before you commit.
A bathroom takes 6 to 8 days including cure, flood test and retiling. A balcony takes 6 to 7 days, a villa roof 12 to 15, and a basement 15 to 21. A 1,000sqm warehouse metal roof runs 12 to 17 days. Add 5 to 10 working days for approvals.
Torch-on membrane and polyurea last 15 to 20 years; liquid PU 10 to 15 years (exposed); metal roof coating 10 to 15 years; and cementitious 8 to 12 years under tile. Lifespan drops where water ponds instead of draining or where upstand detailing was never done properly.
Torch-on bituminous membrane for roofs under screed or tile, which is most villa and tower roofs. Liquid PU where the roof has complex geometry and many penetrations. Polyurea where downtime costs money. The substrate and the finish above decide it, not the price list.
Yes, and it is a large part of our Sharjah work. We replace failed fasteners, reseal screw lines and laps, treat corrosion, and apply an elastomeric coating over the sheet. That extends a roof 10 to 15 years at AED 60 to 140 per sqm, against a far higher resheeting cost.
It costs 40% to 60% more upfront and cuts the cooling load beneath the roof, which shows on the FEWA bill over years. It also extends membrane life by narrowing the temperature range the membrane cycles through. We quote both options side by side rather than defaulting to the expensive one.
Thermal imaging and moisture meters map the wet zone, then flood or dye testing isolates the entry point. Water tracks laterally before it drops, so the stain is rarely under the failure. Around one in four leaks we survey turns out to be plumbing or AC condensate.
Yes. It is the only proof the system works. We pond water for 48 to 72 hours with a marked level, photographed at both ends, and inspect the space below. Covering a membrane without testing means discovering failures after the finishes are down.
Liability follows the source, so the owner of the unit where the leak originates generally carries the damage below, with insurance responding depending on coverage. Report it to building management immediately and document with photos and dates. A written contractor report naming the cause is what settles most of these.
Yes. GRP lining for concrete tanks, sunken slabs and pools, forming a jointless basin independent of the structure. Potable water tanks get compliant food-grade linings. Tank jobs run AED 8,500 to 24,000 depending on capacity and condition.
Waterproofing of roofs, wet areas, and below-ground structures falls under Sharjah Municipality building requirements, and on permitted works it must be completed before finishes go back. Towers, industrial sites and free zones separately require contractor documentation and gate passes, which take 5 to 10 working days.
Emergency repairs: yes, scheduled early morning. Planned work, no. Roof surface temperatures push liquid systems past their application limits, and solvent flashes off before the film levels. October through April is the proper window, and it books out from October.
Up to 10 years depending on system: polyurea, torch-on membrane, and crystalline at 10 years, liquid PU at 7, cementitious at 5. It covers membrane and workmanship failure. Structural movement, third-party damage, and penetrations drilled after installation are excluded, and we state that on the quote.
Tell us the property type, where the water is appearing, and when it started. We will survey, identify the source, and send a written report with a fixed price.
Dubai Technical Works provides professional technical services in Dubai and reliable handyman services in Dubai for homes and businesses. We offer AC, electrical, plumbing, painting, waterproofing, CCTV, tiling, gypsum, and property maintenance services with skilled technicians, transparent pricing, and timely solutions.
Copyright ©Dubai Technical Works Designed BY Crew Innovations